Last Modified: 11-20-2023 |
6.11:8.1.0 |
Doc ID: RM1000000012T9I |
Model Year Start: 2018 |
Model: Camry |
Prod Date Range: [03/2017 - 06/2017] |
Title: LIGHTING (EXT): RELAY: ON-VEHICLE INSPECTION; 2018 MY Camry [03/2017 - 06/2017] |
ON-VEHICLE INSPECTION
PROCEDURE
1. INSPECT H-LP LH RELAY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
3 - 5
|
Voltage not applied between terminals 1 and 2
|
10 kΩ or higher
|
3 - 5
|
Voltage applied between terminals 1 and 2
|
Below 1 Ω
|
If the result is not as specified, replace the H-LP LH relay.
2. INSPECT H-LP RH RELAY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
3 - 5
|
Voltage not applied between terminals 1 and 2
|
10 kΩ or higher
|
3 - 5
|
Voltage applied between terminals 1 and 2
|
Below 1 Ω
|
If the result is not as specified, replace the H-LP RH relay.
3. INSPECT DIM RELAY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
3 - 5
|
Voltage not applied between terminals 1 and 2
|
10 kΩ or higher
|
3 - 5
|
Voltage applied between terminals 1 and 2
|
Below 1 Ω
|
If the result is not as specified, replace the DIM relay.
|