Last Modified: 11-20-2023 6.11:8.1.0 Doc ID: RM1000000012T9I
Model Year Start: 2018 Model: Camry Prod Date Range: [03/2017 - 06/2017]
Title: LIGHTING (EXT): RELAY: ON-VEHICLE INSPECTION; 2018 MY Camry [03/2017 - 06/2017]

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT H-LP LH RELAY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the H-LP LH relay.

2. INSPECT H-LP RH RELAY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the H-LP RH relay.

3. INSPECT DIM RELAY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

3 - 5

Voltage not applied between terminals 1 and 2

10 kΩ or higher

3 - 5

Voltage applied between terminals 1 and 2

Below 1 Ω

If the result is not as specified, replace the DIM relay.