Last Modified: 04-05-2023 |
6.11:8.1.0 |
Doc ID: RM100000000ZAPW |
Model Year Start: 2017 |
Model: Sienna |
Prod Date Range: [08/2016 -
] |
Title: 2GR-FKS STARTING: STARTER: INSTALLATION; 2017 - 2020 MY Sienna [08/2016 - ] |
INSTALLATION
PROCEDURE
1. INSTALL STARTER ASSEMBLY
(a) Using an E8 "TORX" socket wrench, install the 2 stud bolts.
Torque:
37 N·m {377 kgf·cm, 27 ft·lbf}
|
|
*a
|
26.5 mm (1.043 in.)
|
*b
|
18 mm (0.709 in.)
|
*c
|
50 mm (1.969 in.)
|
|
|
(b) Install the starter assembly with the 2 nuts.
Torque:
37 N·m {377 kgf·cm, 27 ft·lbf}
(c) Connect the starter connector.
(d) Connect the terminal 30 with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(e) Close the terminal cap.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Click here
3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Click here
4. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Click here
5. INSTALL BATTERY
Click here
6. INSTALL AIR CLEANER INLET ASSEMBLY
Click here
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected
Click here
|