Last Modified: 04-05-2023 |
6.11:8.1.0 |
Doc ID: RM100000000Z9JE |
Model Year Start: 2017 |
Model: Sienna |
Prod Date Range: [08/2016 -
] |
Title: 2GR-FKS (ENGINE CONTROL): VACUUM SWITCHING VALVE(for Engine Mounting): INSTALLATION; 2017 - 2020 MY Sienna [08/2016 - ] |
INSTALLATION
PROCEDURE
1. INSTALL DUTY VACUUM SWITCHING VALVE
(a) Install the duty vacuum switching valve with the bolt.
Torque:
4.0 N·m {41 kgf·cm, 35 in·lbf}
(b) Connect the 3 vacuum hoses and hose to the duty vacuum switching valve.
(c) Engage the wire harness clamp.
(d) Connect the duty vacuum switching valve connector.
2. INSTALL AIR CLEANER INLET ASSEMBLY
Click here
|