Last Modified: 04-05-2023 6.11:8.1.0 Doc ID: RM100000000YXPO
Model Year Start: 2017 Model: Sienna Prod Date Range: [08/2016 -           ]
Title: 2GR-FKS EMISSION CONTROL: PCV VALVE: INSTALLATION; 2017 - 2020 MY Sienna [08/2016 -        ]

INSTALLATION

PROCEDURE

1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)

(a) Apply a light coat of engine oil to the O-ring.

(b) Using a 22 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.

Torque:

5.0 N·m {51 kgf·cm, 44 in·lbf}

NOTICE:

When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.

2. CONNECT VENTILATION HOSE

(a) Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.

*a

Top of Vehicle

*b

Right Side of Vehicle

*c

45°

*d

Hose Paint Mark

3. INSTALL V-BANK COVER SUB-ASSEMBLY

Click here 2017 - 2020 MY Sienna [08/2016 -        ]; 2GR-FKS (ENGINE MECHANICAL): ENGINE ASSEMBLY: INSTALLATION+