Last Modified: 04-05-2023 |
6.11:8.1.0 |
Doc ID: RM100000000YXPO |
Model Year Start: 2017 |
Model: Sienna |
Prod Date Range: [08/2016 -
] |
Title: 2GR-FKS EMISSION CONTROL: PCV VALVE: INSTALLATION; 2017 - 2020 MY Sienna [08/2016 - ] |
INSTALLATION
PROCEDURE
1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
(a) Apply a light coat of engine oil to the O-ring.
(b) Using a 22 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly LH.
Torque:
5.0 N·m {51 kgf·cm, 44 in·lbf}
NOTICE:
When reusing the PCV valve (ventilation valve sub-assembly), inspect the O-ring.
2. CONNECT VENTILATION HOSE
(a) Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
|
|
*a
|
Top of Vehicle
|
*b
|
Right Side of Vehicle
|
*c
|
45°
|
*d
|
Hose Paint Mark
|
|
|
3. INSTALL V-BANK COVER SUB-ASSEMBLY
Click here
|