Last Modified: 04-05-2023 6.11:8.1.0 Doc ID: RM100000000VK3P
Model Year Start: 2016 Model: Sienna Prod Date Range: [12/2015 -           ]
Title: HEATING / AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION; 2016 - 2020 MY Sienna [12/2015 -        ]

INSTALLATION

PROCEDURE

1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY

(a) Connect the connector.

(b) Engage the 7clips to install the air conditioning control assembly.

2. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL

2016 - 2017 MY Sienna [12/2015 - 11/2017]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+ 2018 - 2020 MY Sienna [11/2017 -        ]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+

3. INSTALL NO. 1 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY

2016 - 2017 MY Sienna [12/2015 - 11/2017]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+ 2018 - 2020 MY Sienna [11/2017 -        ]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+