Last Modified: 04-05-2023 6.11:8.1.0 Doc ID: RM100000000VJNP
Model Year Start: 2016 Model: Sienna Prod Date Range: [12/2015 -           ]
Title: METER / GAUGE / DISPLAY: COMBINATION METER: INSTALLATION; 2016 - 2020 MY Sienna [12/2015 -        ]

INSTALLATION

PROCEDURE

1. INSTALL COMBINATION METER ASSEMBLY

(a) Connect the 2 connectors.

(b) Engage the 2 guides and 2 clips to install the combination meter assembly.

(c) Install the 2 screws.

2. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL

(a) Engage the 9 clips and 3 guides to install the No. 1 instrument cluster finish panel.

3. INSTALL NO. 1 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY

2016 - 2017 MY Sienna [12/2015 - 11/2017]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+ 2018 - 2020 MY Sienna [11/2017 -        ]; INTERIOR PANELS / TRIM: INSTRUMENT PANEL SAFETY PAD: INSTALLATION+

4. INSTALL STEERING WHEEL ASSEMBLY

(See page 2016 - 2020 MY Sienna [12/2015 -        ]; STEERING COLUMN: STEERING WHEEL: INSTALLATION )