INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp stay with the bolt.
Torque:
8.4 N·m {85 kgf·cm, 74 in·lbf}
(b) Connect the wire harness clamp.
(c) Install the generator assembly to the cylinder block sub-assembly with the generator bracket, bolt and nut.
Torque:
20 N·m {204 kgf·cm, 15 ft·lbf}
(d) Install the 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(e) Connect the generator connector to the generator assembly.
(f) Install the generator wire with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(g) Install the terminal cap.
(h) Connect the 3 wire harness clamps.
(i) Connect the magnetic clutch connector to the compressor and magnetic clutch.
2. INSTALL FAN & GENERATOR V BELT
(See page
)
3. INSTALL RADIATOR ASSEMBLY WITH FAN SHROUD AND FAN MOTOR
(See page
)
4. INSTALL FRONT BUMPER ASSEMBLY
(See page
)
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
).
|