Last Modified: 04-05-2023 6.11:8.1.0 Doc ID: RM100000000VIGL
Model Year Start: 2016 Model: Sienna Prod Date Range: [12/2015 - 08/2016]
Title: 2GR-FE STARTING: STARTER: INSTALLATION; 2016 MY Sienna [12/2015 - 08/2016]

INSTALLATION

PROCEDURE

1. INSTALL STARTER ASSEMBLY

(a) Install the starter assembly with the 2 bolts.

Torque:

37 N·m {377 kgf·cm, 27 ft·lbf}

(b) Connect the starter connector.

(c) Connect the terminal 30 with the nut.

Torque:

9.8 N·m {100 kgf·cm, 87 in·lbf}

(d) Close the terminal cap.

2. INSTALL AIR CLEANER AND HOSE

2016 MY Sienna [12/2015 - 08/2016]; 2GR-FE (ENGINE CONTROL): THROTTLE BODY: INSTALLATION+

3. INSTALL BATTERY

2016 MY Sienna [12/2015 - 08/2016]; 2GR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION+

4. INSTALL AIR CLEANER INLET COVER ASSEMBLY SEAL

2016 MY Sienna [12/2015 - 08/2016]; 2GR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION+

5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:

5.4 N·m {55 kgf·cm, 48 in·lbf}

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page 2016 MY Sienna [12/2015 - 08/2016]; INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION )