Last Modified: 04-05-2023 |
6.11:8.1.0 |
Doc ID: RM100000000VIGL |
Model Year Start: 2016 |
Model: Sienna |
Prod Date Range: [12/2015 - 08/2016] |
Title: 2GR-FE STARTING: STARTER: INSTALLATION; 2016 MY Sienna [12/2015 - 08/2016] |
INSTALLATION
PROCEDURE
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
Torque:
37 N·m {377 kgf·cm, 27 ft·lbf}
(b) Connect the starter connector.
(c) Connect the terminal 30 with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(d) Close the terminal cap.
2. INSTALL AIR CLEANER AND HOSE
3. INSTALL BATTERY
4. INSTALL AIR CLEANER INLET COVER ASSEMBLY SEAL
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque:
5.4 N·m {55 kgf·cm, 48 in·lbf}
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
)
|