Last Modified: 04-05-2023 6.11:8.1.0 Doc ID: RM100000000VIEM
Model Year Start: 2016 Model: Sienna Prod Date Range: [12/2015 - 08/2016]
Title: 2GR-FE EMISSION CONTROL: PURGE VALVE: REMOVAL; 2016 MY Sienna [12/2015 - 08/2016]

REMOVAL

PROCEDURE

1. REMOVE V-BANK COVER SUB-ASSEMBLY

2016 MY Sienna [12/2015 - 08/2016]; 2GR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: REMOVAL+

2. REMOVE PURGE VSV

(a) Disconnect the purge VSV connector.

(b) Disconnect the wire harness clamp.

(c) Disconnect the fuel vapor feed hose assembly and No. 1 fuel vapor feed hose.

(d) Remove the bolt and purge VSV.