Last Modified: 04-05-2023 |
6.11:8.1.0 |
Doc ID: RM100000000VI89 |
Model Year Start: 2016 |
Model: Sienna |
Prod Date Range: [12/2015 - 08/2016] |
Title: 2GR-FE (ENGINE CONTROL): CAMSHAFT OIL CONTROL VALVE: REMOVAL; 2016 MY Sienna [12/2015 - 08/2016] |
REMOVAL
PROCEDURE
1. REMOVE INTAKE AIR SURGE TANK ASSEMBLY
(See page
)
2. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
(a) Disconnect the oil control valve connector.
|
|
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
(a) Disengage the 2 clamps.
|
|
(b) Disconnect the oil control valve connector.
|
|
(c) Remove the bolt and oil control valve.
(d) Remove the O-ring from the oil control valve.
4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
(a) Disengage the wire harness clamp.
|
|
(b) Disconnect the oil control valve connector.
(c) Remove the bolt and oil control valve.
(d) Remove the O-ring from the oil control valve.
5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
(a) Disconnect the oil control valve connector.
|
|
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
|